One Step Closer to Riding the Bonneville

Surfing Steven

Surfing Steven

2,580 views

The swing arm is finally back in on the Triumph Bonneville… but it definitely didn’t go as planned. In this one I replace the seals, grease everything up properly, and get the swing arm refitted and torqued up. Also gave ACF-50 a go for the first time to protect the area behind the engine before it all went back together.

There were a couple of moments along the way that nearly caught me out, but managed to work through it and get a solid result in the end.

Still plenty left to do on this rebuild, but this feels like one of the bigger steps done.

Appreciate everyone following along with the project 👍

Like & subscribe if you want to see the rest of the build come together.

_________________

Items used:

ACF50 - https://amzn.to/4bmMC40
Continuous Sprayer - https://amzn.to/3PDkZLv
Bearing Grease - https://amzn.to/4lG21zQ
Nitrile Gloves - https://amzn.to/4sCBjdP
WD40 - https://amzn.to/3PGUEMB
Torque Wrench - https://amzn.to/3NJAtgl
1/4 inch Drive Socket Set - https://amzn.to/4l0YETL
1/2 inch Drive Socket Set - https://amzn.to/40HTQsZ
Breaker Bar - https://amzn.to/3N40MxE
Inspection lamp - https://amzn.to/4sfTg1k
Thor Hammer - https://amzn.to/4uNrNX5

Always check the manufacturers guidance for correct motorcycle torque specifications.

Camera equipment:

DJI Osmo Action 5 Pro - https://amzn.to/3N1yeoe
Tripod - https://amzn.to/46sR3re
DJI Mic 2 - https://amzn.to/4bhLYVa

_________________

Some affiliate links may be used. You won’t be charged a penny for clicking on them, but I may get some commission from any purchases.