The payoff is here! In Part 3 of our 65ft Sea Ray control-system overhaul, we finish the details, power up the new system, check the controls, and take the boat out on the water.
This three-part series follows the transformation from the old mechanical controls and push-pull cables to the completed new control system. Along the way: tight cable routes, fitting challenges, engine-room work, and a few real crew moments.
In this final episode:
• Cable-routing challenges and finishing details
• Helm preparation and first power-up
• Completed installation walkthrough
• Engine-room control check
• Boat underway and dockside series wrap-up
CHAPTERS
00:00 The final stretch & cable-routing challenges
01:37 Finishing details
02:56 Helm & crew moments
03:59 Getting ready for power
04:14 The completed installation
04:33 Checking the new controls
05:41 Out on the water
06:28 Series wrap-up
WATCH THE FULL SERIES
Part 1 — Removing the old mechanical control system: [ADD PART 1 LINK]
Part 2 — Installing the new control system: [ADD PART 2 LINK]
What was your favorite part of this overhaul? Drop a comment below, and subscribe for more boat repairs, upgrades, and behind-the-scenes work.
MUSIC CREDIT
“Paradise Found” by Kevin MacLeod
Source: https://incompetech.com/
Licensed under Creative Commons Attribution 4.0:
https://creativecommons.org/licenses/...
#SeaRay #BoatUpgrade #SeaTrial
The payoff is here! In Part 3 of our 65ft Sea Ray control-system overhaul, we finish the details, power up the new system, check the controls, and take the boat out on the water.
This three-part series follows the transformation from the old mechanical controls and push-pull cables to the completed new control system. Along the way: tight cable routes, fitting challenges, engine-room work, and a few real crew moments.
In this final episode:
• Cable-routing challenges and finishing details
• Helm preparation and first power-up
• Completed installation walkthrough
• Engine-room control check
• Boat underway and dockside series wrap-up
CHAPTERS
00:00 The final stretch & cable-routing challenges
01:37 Finishing details
02:56 Helm & crew moments
03:59 Getting ready for power
04:14 The completed installation
04:33 Checking the new controls
05:41 Out on the water
06:28 Series wrap-up
WATCH THE FULL SERIES
Part 1 — Removing the old mechanical control system: [ADD PART 1 LINK]
Part 2 — Installing the new control system: [ADD PART 2 LINK]
What was your favorite part of this overhaul? Drop a comment below, and subscribe for more boat repairs, upgrades, and behind-the-scenes work.
MUSIC CREDIT
“Paradise Found” by Kevin MacLeod
Source: https://incompetech.com/
Licensed under Creative Commons Attribution 4.0:
https://creativecommons.org/licenses/...
#SeaRay #BoatUpgrade #SeaTrial