Now that the heavy building work is complete I can switch my attention to the plumbing. In this video I'm starting the filter bay pipework (dry fitting) ready for moving the filter in to place after the fibreglassing has been done later this week.
Now that the heavy building work is complete I can switch my attention to the plumbing. In this video I'm starting the filter bay pipework (dry fitting) ready for moving the filter in to place after the fibreglassing has been done later this week.
I have watched all through your build and its impressive ππΌ
I installed the same skimmer as you on our pond but used 4" pipework instead of 2" as its a gravity feed the larger diameter pipework is much better for flowrate. The pond side pipework is not glued so only friction fit as its not necessary.
I also put a valve to adjust the flow to suit our requirements.
The main reason was to add extra water flow through the drum to the bakki shower. (You still have time to core drill a 4" hole through the pond wall).
The other thing is pond returns, how many and where. I have found its not really necessary to have returns in all corners and to prove this to myself i only have two and they are one above the other in one corner creating flow that achieves everything you need to remove all waste. The shower is a 4" underwater return about 6" below the waters surface and directly below that is a 2" pumped return from the moving bed chamber.
I'm looking forward to seeing the progress Phil ππΌ