Previously in the house reno I hag ripped out the old plaster from the hallway wall, this wall has been bowing out and had been repeatedly plastered over to the point of being 2-3 inches thick in places! This plastering and movement in the wall had destroyed the coving along one side of the hallway. The arched window mouldings were long gone and I replaced the hallway arch with a steel lintel becasue it had a massive crack running up it. This video shows the making a fitting of the replacement mouldings.
My Patreon here- Patreon: newyorkshireworkshop
Affiliate Links, As an Amazon Associate I earn from qualifying purchases without any extra cost to you;
Tools used-
Yorkshire tea- (UK) https://amzn.to/2WUYBlv (USA) https://amzn.to/3heqfRQ
super glue and activator- (UK) https://amzn.to/37v6obC (USA) https://amzn.to/3DZcoZb
Peelaway aint stripper (UK) https://amzn.to/407GjJG
Plaste corbels- (UK) https://amzn.to/3yO1Ivk
Previously in the house reno I hag ripped out the old plaster from the hallway wall, this wall has been bowing out and had been repeatedly plastered over to the point of being 2-3 inches thick in places! This plastering and movement in the wall had destroyed the coving along one side of the hallway. The arched window mouldings were long gone and I replaced the hallway arch with a steel lintel becasue it had a massive crack running up it. This video shows the making a fitting of the replacement mouldings.
My Patreon here- Patreon: newyorkshireworkshop
Affiliate Links, As an Amazon Associate I earn from qualifying purchases without any extra cost to you;
Tools used-
Yorkshire tea- (UK) https://amzn.to/2WUYBlv (USA) https://amzn.to/3heqfRQ
super glue and activator- (UK) https://amzn.to/37v6obC (USA) https://amzn.to/3DZcoZb
Peelaway aint stripper (UK) https://amzn.to/407GjJG
Plaste corbels- (UK) https://amzn.to/3yO1Ivk
First, measure the surface of your mold in cm. Height times width and approximate. If it's mostly a square, keep that measurement. A triangle cut in half, or a trapezoid. This can be approximated. Multiply this by 100cm and you'll have the volume. ( This equation will give you the water for 1 meter because it's an easy number to work with). The volume is in cm^3. Divide this by 1000 to give you dm^3 which is equal to Liters. The liter amount should be multiplied by your expected loss/waste. I usually calculate with 15% waste, so multiply your liter amount by 1.15. multiply it one more time by 0.7 to change your fresh mortar amount into water amount. This number is now how much water you need.
I'll give an example just to make sure. Let's say the mold is a 5cm by 5cm square. The surface is 25cm^2. The length is 100cm so the volume of this mold would be 2500cm^3 per meter. This is 2.5dm^3 which is also 2.5 liters. 2.5 liters is multiplied by your expected loss (if unsure always add just a bit more water. Nothing's worse than not having enough to finish a 95% finished mold that is now useless). I'll use 15%, so 2.5 × 1.15 = 2.875. this is multiplied by the water/plaster value of 0.7. 2.875× 0.7 = 2.0125 is the amount of water you need. It doesn't have to be precise. 2 liters is an adequate estimate. Now you know that this particular mold requires 2 liters of water per meter. It's super easy and you have this information in just a few seconds. If it's a one-time thing it's not that important, but if you're pulling 800 meters of this mold for a client, and waste 1-2 kg of plaster every run, it adds up pretty quickly and will cost you unnecessary money and wasted material that you have to dispose of.
Secondly, if possible use the same bucket of plaster for the whole piece. Measure your water, sprinkle the powder on top until small islands form. After letting it sit for 2-3 minutes until all the dry powder absorbs water, (it should look like the top of a desert which small cracks running through it) mix the upper 1/3 of the plaster with a whisk, not a machine. The more you move plaster, it becomes more soft for a short time then it's hardening process accelerates drastically afterwards. Mixing it by hand is highly recommended. Let the material become a little more still before putting it on the table. You can't build up layers if it's water. The most common mistake is not waiting long enough to start working the plaster. Build up the plaster on the table until it's about the same size as your mold. The first run through should by 80% filled already. Move the mold slowly using your hands to pinch and work the material. Material that starts spreading to the side can be scraped towards the top again go fill more holes. The first few runs can be done slowly and calming filling in most of the mold. Later the material is hard enough that you're pressing it into the mold instead of working/pinching it. One of they key points is only mixing the top 1/3 by hand. This means the top material which goes on the table first, hardens first and allows the softer fresher material in the bottom of the bucket to go on top and do a better job of flowing more easily into any gaps and allowing for a good surface. My previous recommendation about using one bucket is because plaster binds in a crystal structure. If you put new plaster on old plaster it might adhere for a while, but it's not a chemical connection. The likelihood of chipping, flaking, etc. Becomes much higher later down the road.