As of August 14, 2026, they have a lot of elevated guideway sections installed along with the guardrails with track preparation happening soon along with station construction since July 7, 2026.
As of August 14, 2026, they have a lot of elevated guideway sections installed along with the guardrails with track preparation happening soon along with station construction since July 7, 2026.